Your Kitchen Remodel Timeline, Week by Week

Updated July 18, 2026 · By the Center Cabinet team, Roswell GA

A typical full kitchen remodel with us takes 2-4 weeks, and you should know before day one which days hurt: the middle stretch without a sink. Here is the honest week-by-week — including the countertop gap that surprises almost every first-time remodeler — as it runs on our own written schedules.

Week 1: demolition and what walls confess

Demolition itself moves fast; the first days are about what it reveals. In 1980s-90s North Atlanta kitchens the usual confessions are wiring that needs updating behind the range wall, plumbing that predates the current owners, and soffits hiding nothing but air. Licensed trades do their rough work now — this is the week that decides whether the schedule holds, which is why we field-verify before demolition, not after.

Week 2: cabinets go in — the fast, visible part

Cabinet installation itself usually takes 2 days. The photo above is that stage: tall pantry wall standing, hood surround framed, counters still to come. Then, the step that defines your timeline: countertop templating. Fabricators measure the installed cabinets — never the drawings — and take several days to about a week to cut the stone.

StageTypical duration
Demolition + trades rough-in3 – 5 days
Cabinet installation~2 days
Countertop template → install4 – 7 days (fabrication)
Tile, plumbing reconnect, finish3 – 5 days
Walkthrough + punch list1 day

Week 3: the quiet week that tests patience

After counters land, backsplash tile, plumbing reconnection and finish work close the project — and this is when “almost done” impatience peaks, because the kitchen looks finished before it works. Grout cures, caulk sets, hardware gets aligned. A crew that rushes this week leaves the punch list you live with; ours schedules it as real work, not a victory lap.

What stretches a timeline — and what never should

Legitimate stretchers: layout changes that move plumbing or gas, back-ordered appliances, and stone slabs awaiting approval. Illegitimate ones: waiting on a subcontractor who serves five bosses, and parts stuck in a shipping queue — the two we structurally avoid by using our own crew and local warehouse stock. The Alpharetta remodel ran demolition to finished photos on exactly this sequence.

What we’d tell a friend

Ask for the schedule in writing with the no-sink window marked, then plan that fortnight like a camping trip: microwave meals, paper plates, and the grill earning its keep. A remodel with a written schedule is an inconvenience; one without is an open-ended hostage situation. Ours comes with the design and quote, before you commit to anything.

Quick Answers

How long does a kitchen remodel really take?

A typical full kitchen with us runs 2-4 weeks from demolition to walkthrough. Cabinet installation itself usually takes 2 days — the rest is demolition, trades, the countertop templating-to-install gap, and tile.

Why is there a gap between cabinets and countertops?

Counters are templated only after cabinets are set, because fabrication works from real measurements, not plans. Fabrication typically takes several days to about a week depending on the stone.

How long will I be without a sink?

The demolition-to-countertop window — usually the middle 1-2 weeks. We tell you the exact dates in the written schedule so you can plan around it, not discover it.